Maintenance of Gravel River complex
Description
the complex is comprised of 5
buildings
main building, motel, house trailer, shed, sauna building,
they are heated by a wood fired
boiler, the motel has hot water from the wood boiler, and electric
heat
the main building seems to have
hotwater from boiler and propane as an alternative.
Facility wood burning boiler
Filled boiler with conditioner and fired furnace for required time
Re: Gravel Rivers wood boiler startup
before starting up the boiler, it is imperative that the water be
tested for ph and treated with Moly Armour 350 to protect the
steel interior parts from rusting
H&H Importers & Sales
3879 Hwy
11-17 Kakebeka Falls, ON P7K 0H7
Phone: 807.939.1152
Model is
Central boiler
Classic
CL6048
Moly armor
350 = 2.5 gallons
Water test
kit
How much
water to fill this boiler 350 gallons
installation
guide
Purchased
MolyArmor 350
Water
Test kit , fuses
Receipt is enclosed
324.41 PAID to
H&H Importers & Sales, used status card
Other expenses
376.00 includes
shipping charges
Added
the MolyArmor 350 and filled the boiler with 350 gallons of water
with a ph of 7.1 Heated water to required temperature of 180
degrees with a 4 hr burn as according to the installation guide
to kill bacteria.
Total
700.41
PAID
to Aime Bouchard RAD
|
boiler hook up to
buildings

Invoice
not sent yet
Re: Gravel Rivers
wood boiler
hook up to hot water loop/circuit to
Main Building,
Main Building,
unhook all connections to bleed air to the hot water pump and
water return line under the building to the furnace.
Check for leaks
$100.00
Heats on
Motel, unhook
all connections to bleed air to the hot water pump and return line
under the building to the furnace.
Check for leaks
$100.00
Heats on
House Trailer unhook
all connections to bleed air to the hot water pump and return line
under the building to the furnace.
Check for leaks,
$100.00
Heats on
Subtotal
$300.00
Other work done
supply lines shut off valve for
the trailer was cracked to the nipple and leaking water,
https://www.facebook.com/photo/?fbid=28826938276916545&set=pob.100000812692564
travel to Kekabeka falls to pick up new valve, changed shut off
valve and nipple in supply line to house trailer they were
cracked, bleed the heat exchanger.
$450.00
Total $750.00
Payment can be made to Aime Bouchard
|
Main Building
Requires new drain in kitchen
requires new hot water heater
needs exhaust fan for kitchen
employee bathroom tub is broken needs new drain ,
front window needs replacement or renovation to wall
Motel
Material
12 - 2X8 X2 INCH STYROFOAM for ground
20 - 2X4X8
LUMBER for window plastic
Roll of 6m
plastic, staples 9/16 for windows
12 tubes of
Caulk for windows and doors , good latex about 10 tubes
not Submitted yet, Date
|
Invoice
Winterize Motel
Repair back skirting,
Materials needed
15 - 2X8 X2” inch styrofoam for
ground and back of building foundation
10 rolls of tuck tape
1 bag insulation for crawl space
3 half inch plywood
25 - 2X4X8 LUMBER for window plastic and dugout closing
12 caulking tubes.
1 Roll of 6m plastic,
3 inch wood screws, jar of them
Note:
Motel is
in good condition, needs new windows front and back They are in
very bad condition
Work done
Replaced
rotten parts of foundation in back of motel and fixed access to
under motel
Put
plastic on windows front and back inside and out (cut heating
cost)
Caulk all
corners and seams where frost might get in
Build
stand to add water to boiler
Total
500.00
|
House Trailer
needs new steps and landing in front and rear doors
spongy area by main bathroom tub
close to toilet
Signs
MOTEL sign works, on off switch in
hot water tank room back of motel
Phone booth is on all the time
Wood burning boiler
wood is delivered we are not sure
how much is needed, 40 or 50 cords, dont know how much we have
house supply line is cracked, picked up parts needed and paid for
them , have not charged for them yet
property is grown in and old sites
are not in very good shape, have not had time to explore the complete
600x600 property yet |