Maintenance of Gravel River complex

 

Description

the complex is comprised of 5 buildings


main building, motel, house trailer, shed, sauna building,

 

they are heated by a wood fired boiler, the motel has hot water from the wood boiler, and electric heat

the main building seems to have hotwater from boiler and propane as an alternative.

 

 

Facility wood burning boiler

 

Filled boiler with conditioner and fired furnace for required time

 

 

 

 


Re: Gravel Rivers wood boiler startup

 

before starting up the boiler, it is imperative that the water be tested for ph and treated with Moly Armour 350 to protect the steel interior parts from rusting

 

H&H Importers & Sales

3879 Hwy 11-17 Kakebeka Falls, ON P7K 0H7
Phone: 807.939.1152

Model is Central boiler Classic  CL6048

 

Moly armor 350 = 2.5 gallons

 

Water test kit

 

How much water to fill this boiler  350 gallons

 

installation guide

 

Purchased

 

MolyArmor 350

Water Test kit , fuses

Receipt is enclosed

324.41                   PAID     to H&H Importers & Sales, used status card


Other expenses       
376.00 includes shipping charges

 

Added the MolyArmor 350 and filled the boiler with 350 gallons of water with a ph of 7.1 Heated water to required temperature of 180 degrees with a 4 hr  burn as according to the installation guide to kill bacteria.
 

 

Total
 

700.41

 

PAID to Aime Bouchard RAD

 

 

 

boiler hook up to buildings

 

Invoice
not sent yet



Re: Gravel Rivers
wood boiler hook up to hot water loop/circuit to
Main Building,

 

Main Building, unhook all connections to bleed air to the hot water pump and water return line under the building to the furnace.
Check for leaks

$100.00

Heats on

 

Motel, unhook all connections to bleed air to the hot water pump and return line under the building to the furnace.
Check for leaks

          
$100.00

Heats on

 

House Trailer  unhook all connections to bleed air to the hot water pump and return line under the building to the furnace.
Check for leaks,
 

$100.00

Heats on

 

Subtotal

 

$300.00


Other work done

supply lines shut off valve for the trailer was cracked to the nipple and leaking water,

 

https://www.facebook.com/photo/?fbid=28826938276916545&set=pob.100000812692564

 



travel to Kekabeka falls to pick up new valve, changed shut off valve and nipple in supply line to house trailer they were cracked, bleed the heat exchanger.

 

$450.00

 

 

Total $750.00

Payment can be made to Aime Bouchard

 

 

Main Building

 

Requires new drain in kitchen

requires new hot water heater

needs exhaust fan for kitchen

 

employee bathroom tub is broken needs new drain ,

front window needs replacement or renovation to wall

 

 

 

Motel

 

Material

12 - 2X8 X2  INCH STYROFOAM  for ground

 

20 - 2X4X8 LUMBER for window plastic

 

Roll of 6m plastic, staples 9/16  for windows

 

12 tubes of Caulk for windows and doors , good latex about 10 tubes

 
not Submitted yet,  Date 

Invoice

 

 

 

Winterize Motel

Repair back skirting,

 

Materials needed

 

15 - 2X8 X2”  inch styrofoam  for ground and back of building foundation

10 rolls of tuck tape

1 bag insulation for crawl space

3 half inch plywood

 

25 - 2X4X8 LUMBER for window plastic and dugout closing

12 caulking tubes.

 

1 Roll of 6m plastic,
 

3 inch wood screws, jar of them
 

Note:

Motel is in good condition, needs new windows front and back They are in very bad condition

 


Work done

 

Replaced rotten parts of foundation in back of motel and fixed access to under motel

Put plastic on windows front and back inside and out  (cut heating cost)

Caulk all corners and seams where frost might get in

 

Build stand to add water to boiler

 

Total

 

500.00

 

 

 

 

House Trailer


needs new steps and landing in front and rear doors

spongy area by main bathroom tub close to toilet

 

 

Signs

 

MOTEL sign works, on off switch in hot water tank room back of motel

 

Phone booth is on all the time

 

Wood burning boiler

 

wood is delivered we are not sure how much is needed, 40 or 50 cords, dont know how much we have

 

house supply line is cracked, picked up parts needed and paid for them , have not charged for them yet

 

 

property is grown in and old sites are not in very good shape, have not had time to explore the complete 600x600 property yet